Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    UN coalition puts child rights at centre of AI policy

    July 8, 2026

    Austria moves ahead with electric steel plant in Donawitz

    July 8, 2026

    WIPO says intangible investment topped US$10 trillion in 2025

    July 8, 2026
    Trending
    • UN coalition puts child rights at centre of AI policy
    • Austria moves ahead with electric steel plant in Donawitz
    • WIPO says intangible investment topped US$10 trillion in 2025
    • Spain knock Portugal out of FIFA World Cup
    • Guterres warns conflict risks demand early action
    • Haaland double sends Norway past Brazil in World Cup
    • France Ebola patient recovers after diagnosis on French soil
    • Southern Europe wildfires test crews in three countries
    • Home
    • Contact Us
    Buckingham DailyBuckingham Daily
    Wednesday, July 8
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Buckingham DailyBuckingham Daily
    Home » Austria moves ahead with electric steel plant in Donawitz
    Business

    Austria moves ahead with electric steel plant in Donawitz

    July 8, 2026
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    DONAWITZ, AUSTRIA / EuroWire / – Austria’s shift toward lower-carbon industry advanced with progress on voestalpine’s new electric arc furnace at Donawitz, one of two major steel decarbonization projects under the company’s greentec steel program. The plant forms part of a move away from coal-heavy blast furnace production toward electric steelmaking powered by green electricity. It also links one of Austria’s main industrial sectors to the country’s climate neutrality goal for 2040.

    Austria moves ahead with electric steel plant in Donawitz
    Austria’s green steel transition advances with electric furnace capacity in Donawitz.

    The Donawitz furnace stands in Styria, a long-established steelmaking region that supplies high-grade steel for rail, automotive and engineering uses. The project will add electric steel production to the existing site from 2027. voestalpine says the Donawitz unit will produce about 850,000 tons of CO2-reduced steel a year once operations start. The company is also building a larger electric arc furnace at Linz.

    Electric arc furnaces melt scrap steel and other metallic inputs with electricity rather than relying mainly on coke and coal. That change can cut direct emissions from steelmaking when the power supply comes from renewable sources. At Donawitz, the new furnace will work alongside the current blast furnace route during the transition. The company says this mixed setup will allow one blast furnace to close as early as 2029.

    Electric steelmaking moves into core production

    The Donawitz project is part of a 1.5 billion euro investment package approved for the first phase of greentec steel. Together, the Linz and Donawitz furnaces are designed to produce about 2.5 million tons of CO2-reduced steel each year from 2027. The two sites account for a major share of Austria’s steel output. Their conversion marks one of the country’s largest industrial climate programs.

    The first phase aims to cut voestalpine’s direct carbon emissions by about 30% by 2029 compared with 2019 levels. The company has said that equals nearly 4 million tons of CO2 a year. It also says the reduction represents about 5% of Austria’s total annual emissions. Those figures place the project among the most significant private-sector climate measures in the country.

    Austria links steel industry to 2040 climate target

    Austria has set a national target to reach climate neutrality by 2040. Heavy industry remains central to that goal because steelmaking needs high heat and large energy inputs. The Donawitz furnace does not end blast furnace production at the site on its own. It begins a staged shift in which electric production takes a larger role in steel output while older coal-based units are reduced.

    Danieli is supplying technology for the Donawitz electric arc furnace, while the Linz furnace forms the second part of the same first-stage program. The wider plan keeps steel production in Austria while lowering emissions from one of its hardest-to-abate industries. voestalpine has set a separate target to reach net zero CO2 emissions in steel production by 2050.

    Related Posts

    UN coalition puts child rights at centre of AI policy

    July 8, 2026

    WIPO says intangible investment topped US$10 trillion in 2025

    July 8, 2026

    Spain knock Portugal out of FIFA World Cup

    July 7, 2026

    Guterres warns conflict risks demand early action

    July 7, 2026

    Haaland double sends Norway past Brazil in World Cup

    July 6, 2026

    France Ebola patient recovers after diagnosis on French soil

    July 6, 2026

    Latest News

    UN coalition puts child rights at centre of AI policy

    July 8, 2026

    Austria moves ahead with electric steel plant in Donawitz

    July 8, 2026

    WIPO says intangible investment topped US$10 trillion in 2025

    July 8, 2026

    Spain knock Portugal out of FIFA World Cup

    July 7, 2026

    Guterres warns conflict risks demand early action

    July 7, 2026

    Haaland double sends Norway past Brazil in World Cup

    July 6, 2026

    France Ebola patient recovers after diagnosis on French soil

    July 6, 2026

    Southern Europe wildfires test crews in three countries

    July 6, 2026
    © 2024 Buckingham Daily | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.